The DD Chief of Staff and five specialist agents are installed with their own gate, queue, watcher, desk, Notion workflow and Slack channel. The lane is running: every timer and the gate are enabled and active, with Chief checks at 08:20, 20:50 and 00:50 Brussels. Click any box to open it.
The lane was installed on 16 October 2026, passes its self-test and is running in production as of 21 October 2026. DD-02 dates remain unconfirmed. Store and theme changes stay manual or in the cockpit. This page contains no credentials. All brand plans →
The sections below describe the lane as built in October. Where they differ, this block is current.
Five Reels and five Stories went out 7-11 Oct across IG and FB, built by hand with Higgsfield, ffmpeg and a PIL Story script.
Live since 17 Sep. The theme hardcoded 'Preorders close 29 September' in three places; whether that was changed after the close is open.
Same price, spec and preorder terms as DD-01. Launch was planned around 2 Nov; window dates and bonus contents are not fixed.
Duration, audio and sticker rules for the character-video format are still judgment calls; the spec sheet is an open item since 7 Oct.
DD Instagram and Facebook are connected in Postiz and readable through meta-insights.
The Chief, Copywriter, Renderer, Publisher, Metrics and Signal are installed with a queue, watcher and desk. Self-test passes. All timers and the gate are enabled and active.
Cool-down, float, preorder-open and closed states. Price, dates and 'link in bio' only inside an open window.
Before scheduling a CTA post the gate reads product state, price, selling-past-zero and the store's preorder note. No write route.
Higgsfield clips with the locked DD-01 reference, run in sequence and checked frame by frame against the reference.
Postiz cannot attach IG polls or question boxes, so prompts are baked as text and flagged.
Every post is logged in both the Content Review DB and the Social Media Posts Log, as DD's standing rule requires.
DNA v2 with the character-video spec, DD-02 brief and window dates, store text fixed, renderer path decided.
Dedicated lane user, Chief, five agents, gate, queue, watcher, desk, renderer files and health checks are installed. The lane stays paused.
A supervised Renderer dry run proves the reference-image still and Kling routes. The first approved batch and one test post must then be verified before any live week begins.
Every slot fires without rescue. Old manual runs retire only after this clean week.