Status snapshot · 21 October 2026

What is finished, and what still needs proof

This page is the short current status. It is a dated record, not live monitoring. The detailed audit files preserve how individual repairs were tested; they are not all active blockers.

Completed

Integration steps 1–6

The original-agent integration release is complete and its guarded deployment evidence is recorded in the release record.

PR6 skill factory

The gated implementation is deployed. It does not silently create capabilities or approve business actions.

Four front doors

Telegram, Slack, ChatGPT and Claude all enter the same router. PR8 (#616, #617, #621), PR9 (#622) and PR10 repairs are merged.

Existing brand lanes

Brand Managers and their separate pipelines remain in place. Their current built, active, off or planned status is listed on the roadmap.

Open acceptance

Where to look next

Use the system overview for the current model and the pipeline map for each Brand Manager’s status. The release record contains completed integration evidence.

Historical audit receipts

The accumulated repair checklist and individual audit reports are retained for traceability. Older “open” labels refer to their recorded audit point. Follow the later release entry or the current status above before treating one as an active blocker.