Renovo Systems automation · build plan · 12 October 2026

Renovo Systems pipeline is back in, planned, not built

A small, weekly B2B lane under the multi-brand Chief: navy trust cards and carousels for renovation business owners, approved by the operator in Slack. The IS isolation pattern fits; its viral scouting and Reels do not, and outreach is not in the roster. Click any box to open it.

Renovo has no live content and no active pipeline. The boardroom lists it as Building with an Appointments offer at €125, on FB and IG with LinkedIn dormant. The legal entity is decided: Kenny & Co, used for every venture. Mphoka confirmed on 12 Oct that Renovo is back in the portfolio. The 3-post pre-outreach floor was met; the outreach module was never built. The Brand DNA posting schedule is a placeholder. Everything stays manual or parked until the offer is settled. This page contains no credentials. All brand plans →

Brand
Renovo Systems B2B, renovation businesses
Output (planned)
2-3 static posts a week proposed, platform open
Approval (planned)
Operator in Slack #renovo-pipeline, weekly batch
Status · Wave 4
Planned · confirmed in Back in the portfolio and legal entity decided (12 Oct). December 2026, exact dates open; build after the offer brief

Where it stands

12 October 2026
Brand statusconfirmed 12 Octdone

Mphoka confirmed on 12 October 2026 that Renovo is back in the portfolio. The July note that it left the empire is superseded.

Partner legal entityKenny & Codone

Decided 12 October 2026: Kenny & Co is the legal entity for every venture, Renovo included. Only the exact registered name for the policy pages is still to confirm.

OfferAppointments €125open

What the €125 buys, the market, the language and the booking link are not in the docs.

Content0 live postsopen

The 3-post pre-outreach floor was met earlier; 8 stale rows were rejected in July. Thresholds are monitor-only.

Posting scheduletime_cet: Noneopen

The same gap that caused M2R's burst-publish incident. Must be machine-readable before any go-live.

Pipelinegate, DB, agentsplanned

Nothing built. Proposed 5 agents: Copywriter, Renderer, Publisher, Metrics, Signal.

What differs from IS

the Faceless After 5 pipeline is the template
No viral scoutingScout and DNA off

Content comes from a fixed pillar list (process, proof, objections, how the offer works), not from copied viral formats.

Static cardsno Reels in v1

The IS Story card renderer, restyled dark navy, makes cards and carousels.

Leads, not reachsuccess metric

Signal reads profile visits, link taps, DMs and booked calls. Reach is not a goal.

Weekly rhythmlow volume

One weekly approval batch of 2-3 posts instead of daily batches.

Outreach gapnot in the roster

Contacting renovation businesses is the real job. Any outreach agent would be new, draft-only, and the operator sends.

Timeline and gates

dates are targets
Decide and prepnow - start of Wave 4

Brand confirmed back in and legal entity decided (12 Oct). Offer brief and Brand DNA v2; landing or booking page live.

BuildDecember 2026, date open

Gate, Renovo Posts DB, 5 agents, navy card renderer, change desk, health check.

First runDecember 2026, date open

Operator approves the shell and the first weekly batch; one test post verified in Postiz.

LiveDecember 2026, date open

Two clean weekly cycles without rescue. Outreach module only later, and only if decided.

Blockers and what retires

decide before build
Blockers4 openblocked
  • The offer (what €125 buys), market, language and booking link are unknown.
  • The Brand DNA posting schedule is a placeholder (time_cet: None).
  • The Renovo Facebook Page connection needs the operator's login; LinkedIn is dormant.
  • Outreach, the real job of this brand, has no agent and needs a legal check before it is built.
Retires after one clean week2 items · disabled first, kept for rollback
  • Renovo in the cockpit's postiz_publish brand map (RENOVO).
  • Renovo in the content-portal and weekly-review brand lists and in the Saturday weekly review run.